Use a mixture of filters or keywords to find documents and resources by department, type or topic.

02951-02 Street Cut for Concrete Pavement Replacement | Restoration Age of Pavement > 5yrs

02951-02 Street Cut for Concrete Pavement Replacement | Restoration Age of Pavement > 5yrs

Updated 11-26-2023

Pavement Repair Detail for Street Cuts (Non-Reinforced Concrete & Brick Pavement)

Pavement Repair Detail for Street Cuts  (Non-Reinforced Concrete & Brick Pavement)

Updated 11-26-2023

List of Standard Details – Street cut Details

List of Standard Details – Street cut Details

Updated 11-26-2023

WCR Shopping Center Application (UA008)

Wastewater capacity reservation application form for shopping centers.

Last updated: 10.25.2019. This document is maintained by Utility Analysis.

Impact Fee Exemption Form (UA006)

Exemption form for low and moderate-cost single-family housing.
Effective: February 1, 2026

Small Meter Permit Requirements

Procedures for obtaining a small water meter.

Last updated: June 7, 2022

WCR Application Fee Schedule (UA0011)

Fee schedule for vacant land

Last updated: 01/01/2025

Tenant Listing Form (UA010)

List of vacant and occupied spaces in a shopping center.

Last updated: 10.25.2019. This document is maintained by Utility Analysis.

Easement Survey Checklist

Checklist for obtaining approval on easement surveys.

Updated: November, 2025.

Sewer Main or Lateral Application

Permit application for the construction of a sanitary sewer main or lateral taps to manholes.