Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Sprinkler Go-to-Work Permit Guideline (CE1260)

By state law, sprinkler plans must be designed by a licensed sprinkler contractor. Typically, the sprinkler contractor is selected by the general contractor after the construction documents have been submitted for a permit or the building permit has been issued. As a result, sprinkler drawings are designed and submitted after the building plans are reviewed and construction has commenced.

Last updated: January 2026

Wastewater Capacity Reservation Name Transfer Application (UA003)

Transfers capacity to a new property owner. (form UA003)

Last updated: 10.25.2019. This document is maintained by Utility Analysis

One Stop Walk-in Service Prerequisite Checklist (CE-1412)

Revised: February 2025

Wastewater Capacity Reservation Revision Application (UA007)

Request changes to your WCR letter.

Last updated: 05.19.2022. This document is maintained by Utility Analysis.

Application Authorization Form (UA002)

Authorizes an agent on behalf of owner.

Last updated: 08.26.2019. This document is maintained by Utility Analysis.

Last Update: 2.11.2020. Updated to require representative's signature.

One-Stop Walk-In Service Qualifications for Residential Plan Review (CE-1411)

Last Updated: February 2025

User Guide for online WCR Application Process

Step by step guide for applying for a wastewater capacity letter online.

 

Last updated: January 18, 2022

Shopping Center Approval Denial Letter Application (UA009)

For shopping center with excess capacity.

Last updated: 10.25.2019. This document is maintained by Utility Analysis.

iPermits How to Purchase a Trade Permit

How to guide for purchasing a trade permit online through iPermits portal.

Surface Restoration Bond

One year surface restoration bond - informal contract

This document is maintained by Taps & Meters.