Use a mixture of filters or keywords to find documents and resources by department, type or topic.
01555-05 TCP Typical Detour Routing with One Lane Closure (One Block)
Updated 11-26-2023
02760-16 Two-Way Left-Turn Lane Detail 2
Updated 11-26-2023
01554-03 Street Name Sign and Sign Mounting
Updated 11-26-2023
01554-09 Typical City of Houston Signs (Sheet 2 of 2)
Updated 11-26-2023
01554-11 Overhead Street Name Sign Mounting Details
Updated 12-21-2023
01554-02 Sign Base Hard Surface Mounting Details
Updated 11-26-2023
01554-08 Typical City of Houston Signs (Sheet 1 of 2)
Updated 11-26-2023
01554-06 Ground Mounted Sign Sizes
Updated 11-26-2023
01554-07 Typical Sign Placement
Updated 11-26-2023
When the Residential Energy Code requires energy testing (air leakage and duct leakage tests), the results must be documented using this form. The testing must be done by an independent third party energy technician registered with the City of Houston. The results will need to be submitted to the Mechanical Inspector at the final inspection. If more than 3 systems are installed, please fill out an additional form.
Last updated: 01-30-2024