Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Impact Fee Exemption Form (UA006)

Exemption form for low and moderate-cost single-family housing.
Effective: February 1, 2026

Commercial Prerequisite Checklist (CE1105)

Complete and attach this form to each plan set. Commercial plans must be submitted with this form in order for your plans to be considered as complete for the purpose of plan review.

Updated: October 4, 2024

Residential Plan Review Checklist for Traffic

Residential plan review checklist for Traffic (OCE-002)

 

Last updated: 8/23/2021

24-06-R Swimming Pool Demolition

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing. 

Updated: 06/05/2024

Building Code Design Criteria (CE1110)

Overview of Building Code Design Criteria

Last updated: May 22, 2025.

Small Meter Permit Requirements

Procedures for obtaining a small water meter.

Last updated: June 7, 2022

Wastewater Capacity Reservation Revision Application (UA007)

Request changes to your WCR letter.

Last updated: 05.19.2022. This document is maintained by Utility Analysis.

Application Authorization Form (UA002)

Authorizes an agent on behalf of owner.

Last updated: 08.26.2019. This document is maintained by Utility Analysis.

Last Update: 2.11.2020. Updated to require representative's signature.

Modular Building Submittal Requirements (CE1099)

To define the minimum plan review requirements to obtain a building permit for the installation of a Modular or Prefabricated Building. Code requirements that apply to newly constructed buildings also apply to these prefabricated structures except state approved plans which are accepted without additional review. 

Last updated: February 2024

WCR Application Fee Schedule (UA0011)

Fee schedule for vacant land

Last updated: 01/01/2025