Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Commercial Prerequisite Checklist (CE1105)

Complete and attach this form to each plan set. Commercial plans must be submitted with this form in order for your plans to be considered as complete for the purpose of plan review.

Updated: October 4, 2024

Asbestos Survey Guideline (CE1258)

Senate Bill 509 requires municipalities to verify that an asbestos survey has been conducted prior to issuing renovation or demolition permits for public or commercial buildings, and affects renovation and demolition permits for public or commercial buildings issued by municipalities on or after January 1, 2002.

Last updated: 06/09/2022

Pedestrian Protection Permit Guideline (CE1124)

This guide outlines the permit and the plan review process associated with erecting scaffolding and other structures to serve as pedestrian protection during construction, repairs, and demolition projects.

Last updated: 01-01-2023

Surface Restoration Bond

One year surface restoration bond - informal contract

This document is maintained by Taps & Meters.

Impact Fee Service Unit Equivalent Table (UA005)

Service unit equivalent table for determining impact fees. (form UA005)

Last updated: May 20, 2021 

Consent to Encroachment over City Easement

Form PW-9873C for consent to encroachment over a City easement.

Last updated: June 2020

Modular Building Submittal Requirements (CE1099)

To define the minimum plan review requirements to obtain a building permit for the installation of a Modular or Prefabricated Building. Code requirements that apply to newly constructed buildings also apply to these prefabricated structures except state approved plans which are accepted without additional review. 

Last updated: February 2024

Solar APP+ Application Guidelines_CE-1410

Last Updated: June 20, 2025.

Form 584 - Water Meter Easement Dedication

Easement dedication form for water meters (Form 584)

Wastewater Capacity Reservation Revision Application (UA007)

Request changes to your WCR letter.

Last updated: 05.19.2022. This document is maintained by Utility Analysis.