Use a mixture of filters or keywords to find documents and resources by department, type or topic.
- 02081-05 Storm Sewer Manhole Type "E" For Existing Monolithic
- 02081-06 Storm Sewer Junction Box With Lid Or Grate
- 02081-07 Lateral Connection To Existing Monolithic
- 02081-08 Proposed Manhole On Existing Box
This is a guide to assist in the plan review, permit, and inspection process for the installation of a solar panel system. The required components to be included in drawings to obtain permits, and the items that the city inspectors will be verifying in the field during the inspection process are included.
Last updated: 03/25/2024
General prerequisite requirements for plan review. This form must be completed by the sign contractor.
Last updated: December 5, 2025
The plan review checklist was created to assist customers submitting plans for standpipe systems for HFD plan review and permit approval.
Last Updated: June 2024
The following drawing is an example of typical construction and can be used as a reference.
NOTE: This is not an engineered drawing.
The following drawing is an example of typical construction and can be used as a reference.
NOTE: This is not an engineered drawing.
List of Standard Details – Storm Sewer Details
Last Updated: 5-23-2024
Wastewater capacity reservation application form for shopping centers.
Last updated: 10.25.2019. This document is maintained by Utility Analysis.
The Residential One-Stop Guideline lists the various requirements for plan submittal and review of residential construction projects.
Last updated: September 8, 2025
- 02317-03 Sanitary or Storm Sewer Bedding and Backfill for Dry Stable Trench
- 02317-05 Precast Concrete Box Storm Sewer Bedding and Backfill for Dry Stable Trench
- 02317-06 Precast Concrete Box Storm Sewer Bedding and Backfill for Wet Stable Trench
- 02317-07 Precast Concrete Box Storm Sewer Bedding and Backfill with Seal Slab