Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Standpipe Plan Review Checklist (CE1353)

The plan review checklist was created to assist customers submitting plans for standpipe systems for HFD plan review and permit approval.

Last Updated: June 2024

Storm Checklist for Residential Projects

Storm plan review checklist for residential projects with tract size of less than 15,000 square feet

Last updated: Feb. 17, 2022

02893-02 Electrical Service Support Pedestal Service Type PS

02893-02 Electrical Service Support Pedestal Service Type PS

Updated 11-26-2023

02893-02_2023_11_MOD.dwg

02893-02 Electrical Service Support Pedestal Service Type PS

Updated 12-26-2023

02760-12_2023_11_MOD.dwg

02760-12 Typical Crosswalk Details

Updated 12-26-2023

List of Standard Details-Storm Sewer Details

List of Standard Details – Storm Sewer Details  

Last Updated: 5-23-2024

01554-08 Typical City of Houston Signs (Sheet 1 of 2)

01554-08 Typical City of Houston Signs (Sheet 1 of 2)

Updated 11-26-2023

Drawings 02317-03 Through 07
  • 02317-03  Sanitary or Storm Sewer Bedding and Backfill for Dry Stable Trench
  • 02317-05  Precast Concrete Box Storm Sewer Bedding and Backfill for Dry Stable Trench
  • 02317-06  Precast Concrete Box Storm Sewer Bedding and Backfill for Wet Stable Trench
  • 02317-07  Precast Concrete Box Storm Sewer Bedding and Backfill with Seal Slab
Commercial Prerequisite Checklist (CE1105)

Complete and attach this form to each plan set. Commercial plans must be submitted with this form in order for your plans to be considered as complete for the purpose of plan review.

Updated: October 4, 2024

01555-05 TCP Typical Detour Routing with One Lane Closure (One Block)

01555-05 TCP Typical Detour Routing with One Lane Closure  (One Block)

Updated 11-26-2023