Standpipe Plan Review Checklist (CE1353)

The plan review checklist was created to assist customers submitting plans for standpipe systems for HFD plan review and permit approval.

Last Updated: June 2024

Storm Checklist for Residential Projects

Storm plan review checklist for residential projects with tract size of less than 15,000 square feet

Last updated: Feb. 17, 2022

02317-09 (2020 Detail)

2020 Detail for 02317-09 Standard LDWL Excavation and Backfill Detail 

02447-01 Bedding Backfill Auger Pit Auger Hole
Commercial Prerequisite Checklist (CE1105)

Complete and attach this form to each plan set. Commercial plans must be submitted with this form in order for your plans to be considered as complete for the purpose of plan review.

Updated: October 4, 2024

Energy Testing Results (CE1302)

When the Residential Energy Code requires energy testing (air leakage and duct leakage tests), the results must be documented using this form. The testing must be done by an independent third party energy technician registered with the City of Houston. The results will need to be submitted to the Mechanical Inspector at the final inspection. If more than 3 systems are installed, please fill out an additional form.

Last updated: 01-30-2024

02523-01 Reduced Pressure Backflow Preventer RPBP
02520-01 (2020 Detail)

2020 Detail for 02520-01 Standard Fire Hydrant Detail 

15641-02 (2020 Detail)

2020 Detail for 15641-02 Standard LDWL Cathodic Protection Details for Test Stations (Sheet 2 of 3)

15640-01 Standard LDWL Cathodic Protection Details for Joint Bonding (Sheet 1 of 2)