Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Energy Compliance Information Certificate

The Energy Compliance Information Certificate sticker has been updated to conform to the newly adopted 2015 IECC. The sticker can be used to comply with Section 401.3 of the Houston Energy Code or, if preferred, a builder can use their own compliance sticker. After it is completed and printed, the certificate must be attached inside the electrical panel. This sticker can be printed on Avery® Labels 6876.

Last updated: February 20, 2025

Commercial Prerequisite Checklist (CE1105)

Complete and attach this form to each plan set. Commercial plans must be submitted with this form in order for your plans to be considered as complete for the purpose of plan review.

Updated: October 4, 2024

Standpipe Plan Review Checklist (CE1353)

The plan review checklist was created to assist customers submitting plans for standpipe systems for HFD plan review and permit approval.

Last Updated: June 2024

Storm Checklist for Residential Projects

Storm plan review checklist for residential projects with tract size of less than 15,000 square feet

Last updated: Feb. 17, 2022

02951-02 Street Cut for Concrete Pavement Replacement | Restoration Age of Pavement > 5yrs

02951-02 Street Cut for Concrete Pavement Replacement | Restoration Age of Pavement > 5yrs

Updated 11-26-2023

02951-04 Pavement Repair Detail for Street Cuts (Flex-Base Pavement & Concrete Pavement)

02951-04 Pavement Repair Detail for Street Cuts (Flex-Base Pavement & Concrete Pavement)

Updated 11-26-2023

Pavement Repair Detail for Street Cuts (Non-Reinforced Concrete & Brick Pavement)

Pavement Repair Detail for Street Cuts  (Non-Reinforced Concrete & Brick Pavement)

Updated 11-26-2023

List of Standard Details – Street cut Details

List of Standard Details – Street cut Details

Updated 11-26-2023

Energy Testing Results (CE1302)

When the Residential Energy Code requires energy testing (air leakage and duct leakage tests), the results must be documented using this form. The testing must be done by an independent third party energy technician registered with the City of Houston. The results will need to be submitted to the Mechanical Inspector at the final inspection. If more than 3 systems are installed, please fill out an additional form.

Last updated: 01-30-2024

02951-01 to 02951-03

02951-01 Street Cut Replacement Concrete Less Than 5 Years Age

02951-02 Street Cut Replacement Concrete Over 5 Years Age

02951-03 Street Cut Replacement Asphalt Pavement of All Ages