Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Commercial Elevator Permit Application (CE1331)

For installation, relocation or alteration of Elevators, Dumbwaiters, Moving Walks, Chairlifts, Escalators, Manlifts, Wheelchairlifts, Personnel Hoists.

Last updated: 03/08/2024

Sign Administration Procedures for Paid Plan Review (CE 1335)

Procedures and qualifications for paid plan review (customer paid overtime).

 

Last updated: 1/1/2020

COMcheck Public Workshop Presentation Slides

Presentation slides from the 2015 IECC COMcheck public workshop on September 16, 2020.

Residential Elevator Permit Application (CE1332)

For installation, relocation or alteration of Elevators, Dumbwaiters, Moving Walks, Chairlifts, Escalators, Manlifts, Wheelchairlifts, Personnel Hoists.

Last updated: 03/08/2024

17-08-R Emergency Escape and Rescue Windows (Examples)

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.  

17-10-C Repair of Flooded 2-Hour Fire Wall

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.  

Pedestrian Protection Permit Guideline (CE1124)

This guide outlines the permit and the plan review process associated with erecting scaffolding and other structures to serve as pedestrian protection during construction, repairs, and demolition projects.

Last updated: 01-01-2023

Residential Standby Generator Permit and Inspection Guide (CE1060)

This handout was created to aid customers with understanding the permit and inspection process to install a residential standby generator. Included are the required permits, items that must be available to city field inspectors at the construction site, and the items that the city inspectors will be verifying in the field during the inspection process.

Last updated: 01/01/2023

10-09-C Encroachment into the Public Right of Way

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.  

Guidelines for a Successful Mylar Walk Through

Guidelines for a successful mylar walk through.

Last updated: 12/6/2019