Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Complete and attach this form to each plan set. Commercial plans must be submitted with this form in order for your plans to be considered as complete for the purpose of plan review.
Updated: October 4, 2024
When the Residential Energy Code requires energy testing (air leakage and duct leakage tests), the results must be documented using this form. The testing must be done by an independent third party energy technician registered with the City of Houston. The results will need to be submitted to the Mechanical Inspector at the final inspection. If more than 3 systems are installed, please fill out an additional form.
Last updated: 01-30-2024
The plan review checklist was created to assist customers submitting plans for standpipe systems for HFD plan review and permit approval.
Last Updated: June 2024
Application completed & submitted by licensed sign contractor to secure permit(s) to install sign(s).
Last Updated: December 2025.
Guidelines and forms for requesting an after-hours review service (AHRS) for Building Code Enforcement Plan Review.
Last updated: January 2026
Sound Amplifying Equipment Daily Permit Application.
Application for residential and non residential burglar alarm and panic alarm permits.
The Energy Compliance Information Certificate sticker has been updated to conform to the newly adopted 2015 IECC. The sticker can be used to comply with Section 401.3 of the Houston Energy Code or, if preferred, a builder can use their own compliance sticker. After it is completed and printed, the certificate must be attached inside the electrical panel. This sticker can be printed on Avery® Labels 6876.
Last updated: February 20, 2025
Storm plan review checklist for residential projects with tract size of less than 15,000 square feet
Last updated: Feb. 17, 2022
Environmental monitoring facility removal closure and restoration bond form.
Last updated: April 2025