Use a mixture of filters or keywords to find documents and resources by department, type or topic.
02317-09 (2020 Detail)
2020 Detail for 02317-09 Standard LDWL Excavation and Backfill Detail
02447-01 Bedding Backfill Auger Pit Auger Hole
Energy Testing Results (CE1302)
When the Residential Energy Code requires energy testing (air leakage and duct leakage tests), the results must be documented using this form. The testing must be done by an independent third party energy technician registered with the City of Houston. The results will need to be submitted to the Mechanical Inspector at the final inspection. If more than 3 systems are installed, please fill out an additional form.
Last updated: 01-30-2024
02523-01 Reduced Pressure Backflow Preventer RPBP
15641-02 (2020 Detail)
2020 Detail for 15641-02 Standard LDWL Cathodic Protection Details for Test Stations (Sheet 2 of 3)
15640-01 Standard LDWL Cathodic Protection Details for Joint Bonding (Sheet 1 of 2)
15640-02 Standard LDWL Cathodic Protection Details for Joint Bonding (Sheet 2 of 2)
02526-03 Typical Piping Arrangement 4-inch Turbine Compound Meter
16640-02 Standard LDWL Cathodic Protection Rectifier & Deep Anode Ground Bed Details (Sheet 1 of 2)