Use a mixture of filters or keywords to find documents and resources by department, type or topic.
When the Residential Energy Code requires energy testing (air leakage and duct leakage tests), the results must be documented using this form. The testing must be done by an independent third party energy technician registered with the City of Houston. The results will need to be submitted to the Mechanical Inspector at the final inspection. If more than 3 systems are installed, please fill out an additional form.
Last updated: 01-30-2024
List of Standard Details – Street cut Details
Updated 11-26-2023
02951-01 Street Cut Replacement Concrete Less Than 5 Years Age
02951-02 Street Cut Replacement Concrete Over 5 Years Age
02951-03 Street Cut Replacement Asphalt Pavement of All Ages
The Energy Compliance Information Certificate sticker has been updated to conform to the newly adopted 2015 IECC. The sticker can be used to comply with Section 401.3 of the Houston Energy Code or, if preferred, a builder can use their own compliance sticker. After it is completed and printed, the certificate must be attached inside the electrical panel. This sticker can be printed on Avery® Labels 6876.
Last updated: February 20, 2025
Pavement Repair Detail for Street Cuts (Non-Reinforced Concrete & Brick Pavement)
Updated 11-26-2023
02951-04 Pavement Repair Detail for Street Cuts (Flex-Base Pavement & Concrete Pavement)
Updated 11-26-2023
02951-03 Street Cut for Asphalt Pavement Replacement | Restoration for Pavement of All Ages
Updated 12-18-2023
02951-03 Street Cut for Asphalt Pavement Replacement | Restoration for Pavement of All Ages
Updated 11-26-2023
City of Houston, Texas, Ordinance Number 2007-777. An ordinance amending the City of Houston Fire Code relating to administrative fees.