Use a mixture of filters or keywords to find documents and resources by department, type or topic.
For shopping center with excess capacity.
Last updated: 10.25.2019. This document is maintained by Utility Analysis.
The following detail and specifications, issued in conjunction with the Department of Neighborhoods and Health Department, identifies requirements for the demolition of swimming pools and spas; including, but not limited to, pools determined to be in violation of the City of Houston Minimum Standards or Dangerous Building Ordinance.
Last updated: January 2026
One year surface restoration bond - informal contract
This document is maintained by Taps & Meters.
Service unit equivalent table for determining impact fees. (form UA005)
Last updated: May 20, 2021
Form PW-9873C for consent to encroachment over a City easement.
Last updated: June 2020
The guide explains the requirements and procedures of the City of Houston-approved fabricator program.
Last updated: February 20, 2026
This is an example inspection letter for a Solar APP+ project. For an example of a typical solar panel system, refer to form CE-1387a.
Last updated: Nov. 17, 2022
This is an example of an inspection letter for a typical solar panel system. For a Solar APP+ project, refer to form CE-1387b.
Last updated: Nov. 17, 2022
Easement dedication form for water meters (Form 584)
Request changes to your WCR letter.
Last updated: 05.19.2022. This document is maintained by Utility Analysis.