Use a mixture of filters or keywords to find documents and resources by department, type or topic.

02775-05 Commercial & High Density Conditions Curb Ramp Details

Commercial & High-Density Conditions Curb Ramp Details

Updated 11-26-2023

02775-05_2023_11_MOD.dwg

02775-05 Commercial & High Density Conditions Curb Ramp Details

Updated 12-19-2023

02771-01_2023_11_MOD.dwg

02771-01 Curb, Curb and Gutter, and Header Details

Updated 12-19-2023

02775-02_2023_11_MOD.dwg

02775-02 Typical Curb Ramp Details

Updated 12-19-2023

Modular Building Submittal Requirements (CE1099)

To define the minimum plan review requirements to obtain a building permit for the installation of a Modular or Prefabricated Building. Code requirements that apply to newly constructed buildings also apply to these prefabricated structures except state approved plans which are accepted without additional review. 

Last updated: February 2024

02775-01_2023_11_MOD.dwg

02775-01 Typical Sidewalk Layout and Details for Streets with Curbs

Updated 12-19-2023

02754-04 Proposed Sidewalk Through Driveway with Minimal Elevation Difference

Proposed Sidewalk Through Driveway with Minimal Elevation Difference 

Updated 11-26-2023

Approved Fabricator Guidelines (CE1285)

The guide explains the requirements and procedures of the City of Houston-approved fabricator program. 

Last updated: February 20, 2026

Post Install Solar Inspection Letter (CE-1387b)

This is an example inspection letter for a Solar APP+ project. For an example of a typical solar panel system, refer to form CE-1387a.

Last updated: Nov. 17, 2022 

Solar APP+ Application Guidelines_CE-1410

Last Updated: June 20, 2025.