Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Non-Licensed User Account Registration Form

CE-1356 Registration Form for Non-Licensed User Accounts

Boiler Operator Permit On-site Exam Request Form (CE1371)

Boiler Operator Permit On-site Exam Request Form

Updated: 03/08/2024

Solar APP+ Application Guidelines_CE-1410

Last Updated: June 20, 2025.

Fabricator Qualification Statement (CE1269)

Last updated: June 02, 2025.

Audit of Fabrication Practices Steel (CE1288)

Form must be completed by the Special Inspection Agency.

Last updated: September 25, 2025.

Solicitud para la ocupacion, inspeccion de acatamiento (CE1045s)

Solicitud para la ocupacion, inspeccion de acatamiento (occupancy application in Spanish)

Last updated: January 2025

14-03-R Single Family Residential Driveways Interlocking Concrete Permeable Paver and Flexible Plastic Grid Paver Systems

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.  

Commercial Prerequisite Checklist (CE1105)

Complete and attach this form to each plan set. Commercial plans must be submitted with this form in order for your plans to be considered as complete for the purpose of plan review.

Updated: October 4, 2024

Solar Photovoltaic Panel Permit & Inspection Guide and Checklist(CE1198)

This is a guide to assist in the plan review, permit, and inspection process for the installation of a solar panel system. The required components to be included in drawings to obtain permits, and the items that the city inspectors will be verifying in the field during the inspection process are included.

Last updated: 03/25/2024

Plan Review Prerequisites Checklist (CE-1427)

General prerequisite requirements for plan review. This form must be completed by the sign contractor.

Last updated: December 5, 2025