Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Wastewater capacity reservation application form for shopping centers.
Last updated: 10.25.2019. This document is maintained by Utility Analysis.
CE-1314: Second Grade Stationary Engineer Application
Last updated: 06/28/2024
Exemption form for low and moderate-cost single-family housing.
Effective: February 1, 2026
For Plumbing, Electrical and HVAC reinspections.
Procedures for obtaining a small water meter.
Last updated: June 7, 2022
Request changes to your WCR letter.
Last updated: 05.19.2022. This document is maintained by Utility Analysis.
When the Residential Energy Code requires energy testing (air leakage and duct leakage tests), the results must be documented using this form. The testing must be done by an independent third party energy technician registered with the City of Houston. The results will need to be submitted to the Mechanical Inspector at the final inspection. If more than 3 systems are installed, please fill out an additional form.
Last updated: 01-30-2024
Form required to register or renew electrical licenses.
Last updated: January 2024
Authorizes an agent on behalf of owner.
Last updated: 08.26.2019. This document is maintained by Utility Analysis.
Last Update: 2.11.2020. Updated to require representative's signature.
Fee schedule for vacant land
Last updated: 01/01/2025