Use a mixture of filters or keywords to find documents and resources by department, type or topic.
This guide provides the qualifications and submittal requirements for requesting a Certificate of Occupancy for existing buildings.
Last updated: November 5, 2025.
For shopping center with excess capacity.
Last updated: 10.25.2019. This document is maintained by Utility Analysis.
This document is maintained by the Utility Analysis & Planning Branch.
Updated 2/3/2020
This brochure is intended to provide a very high level overview of the commercial building permit process.
Last updated: 1/1/2019
Procedures for obtaining a water main abandonment permit.
Last updated: 1/1/2019
Application for water lines or fire hydrants.
Last updated: 06/13/2022
Developer performance bond as required by City of Houston Code Sec. 47-163. This is for non-Developer Participation Contract (DPC) projects.
Last update: 07/24/2020.
This document is maintained by Taps & Meters.