Use a mixture of filters or keywords to find documents and resources by department, type or topic.

WCR Shopping Center Application (UA008)

Wastewater capacity reservation application form for shopping centers.

Last updated: 10.25.2019. This document is maintained by Utility Analysis.

Impact Fee Exemption Form (UA006)

Exemption form for low and moderate-cost single-family housing.
Effective: February 1, 2026

Dangerous Building Demolition (CE_1280)

This guide provides the requirements for demolition of dangerous buildings.

Last updated: 04-03-2025

Small Meter Permit Requirements

Procedures for obtaining a small water meter.

Last updated: June 7, 2022

Wastewater Capacity Reservation Revision Application (UA007)

Request changes to your WCR letter.

Last updated: 05.19.2022. This document is maintained by Utility Analysis.

Application Authorization Form (UA002)

Authorizes an agent on behalf of owner.

Last updated: 08.26.2019. This document is maintained by Utility Analysis.

Last Update: 2.11.2020. Updated to require representative's signature.

WCR Application Fee Schedule (UA0011)

Fee schedule for vacant land

Last updated: 01/01/2025

Tenant Listing Form (UA010)

List of vacant and occupied spaces in a shopping center.

Last updated: 10.25.2019. This document is maintained by Utility Analysis.

Easement Survey Checklist

Checklist for obtaining approval on easement surveys.

Updated: November, 2025.

Live-Work Program (CE1277)

This guide provides an overview of the qualifications and submittal requirements for projects that wish to establish a Live-Work unit through the Occupancy Inspection Section.

Last updated: 10/22/2024