Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Last updated: June 02, 2025.
Form must be completed by the Special Inspection Agency.
Last updated: September 25, 2025.
Solicitud para la ocupacion, inspeccion de acatamiento (occupancy application in Spanish)
Last updated: January 2025
The following drawing is an example of typical construction and can be used as a reference.
NOTE: This is not an engineered drawing.
Complete and attach this form to each plan set. Commercial plans must be submitted with this form in order for your plans to be considered as complete for the purpose of plan review.
Updated: October 4, 2024
This is a guide to assist in the plan review, permit, and inspection process for the installation of a solar panel system. The required components to be included in drawings to obtain permits, and the items that the city inspectors will be verifying in the field during the inspection process are included.
Last updated: 03/25/2024
General prerequisite requirements for plan review. This form must be completed by the sign contractor.
Last updated: December 5, 2025
The plan review checklist was created to assist customers submitting plans for standpipe systems for HFD plan review and permit approval.
Last Updated: June 2024
This form is to be used for occupied residences only. Form must be received at least one day before the requested inspection date.
Revised 03/08/2024
The following drawing is an example of typical construction and can be used as a reference.
NOTE: This is not an engineered drawing.