Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Procedures and qualifications for paid plan review (customer paid overtime).
Last updated: 1/1/2020
Presentation slides from the 2015 IECC COMcheck public workshop on September 16, 2020.
The following drawing is an example of typical construction and can be used as a reference.
NOTE: This is not an engineered drawing.
The following drawing is an example of typical construction and can be used as a reference.
NOTE: This is not an engineered drawing.
This guide outlines the permit and the plan review process associated with erecting scaffolding and other structures to serve as pedestrian protection during construction, repairs, and demolition projects.
Last updated: 01-01-2023
This guide provides an overview of the qualifications and submittal requirements for projects that wish to establish a Live-Work unit through the Occupancy Inspection Section.
Last updated: 2/13/2019
This handout was created to aid customers with understanding the permit and inspection process to install a residential standby generator. Included are the required permits, items that must be available to city field inspectors at the construction site, and the items that the city inspectors will be verifying in the field during the inspection process.
Last updated: 01/01/2023
This guide provides the qualifications and submittal requirements for requesting a Certificate of Occupancy for existing buildings.
Last updated: 2/12/2019
The following drawing is an example of typical construction and can be used as a reference.
NOTE: This is not an engineered drawing.
Guidelines for a successful mylar walk through.
Last updated: 12/6/2019