Use a mixture of filters or keywords to find documents and resources by department, type or topic.
To define the minimum plan review requirements to obtain a building permit for the installation of a Modular or Prefabricated Building. Code requirements that apply to newly constructed buildings also apply to these prefabricated structures except state approved plans which are accepted without additional review.
Last updated: February 2024
The guide explains the requirements and procedures of the City of Houston-approved fabricator program.
Last updated: February 20, 2026
This is an example inspection letter for a Solar APP+ project. For an example of a typical solar panel system, refer to form CE-1387a.
Last updated: Nov. 17, 2022
Last Updated: June 20, 2025.
This is an example of an inspection letter for a typical solar panel system. For a Solar APP+ project, refer to form CE-1387b.
Last updated: Nov. 17, 2022
The following drawing is an example of typical construction and can be used as a reference.
NOTE: This is not an engineered drawing.
Complete and attach this form to each plan set. Commercial plans must be submitted with this form in order for your plans to be considered as complete for the purpose of plan review.
Updated: October 4, 2024
Registration & Renewal Process for State Air Conditioning Licenses.
Last updated: 03/08/2024
This is a guide to assist in the plan review, permit, and inspection process for the installation of a solar panel system. The required components to be included in drawings to obtain permits, and the items that the city inspectors will be verifying in the field during the inspection process are included.
Last updated: 03/25/2024
General prerequisite requirements for plan review. This form must be completed by the sign contractor.
Last updated: December 5, 2025