Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Commercial Prerequisite Checklist (CE1105)

Complete and attach this form to each plan set. Commercial plans must be submitted with this form in order for your plans to be considered as complete for the purpose of plan review.

Updated: October 4, 2024

Energy Testing Results (CE1302)

When the Residential Energy Code requires energy testing (air leakage and duct leakage tests), the results must be documented using this form. The testing must be done by an independent third party energy technician registered with the City of Houston. The results will need to be submitted to the Mechanical Inspector at the final inspection. If more than 3 systems are installed, please fill out an additional form.

Last updated: 01-30-2024

2147 Prerequisites Plan Procedures

Prerequisites Plan Procedures.

Live-Work Program (CE1277)

This guide provides an overview of the qualifications and submittal requirements for projects that wish to establish a Live-Work unit through the Occupancy Inspection Section.

Last updated: 10/22/2024

Frequently Missed Inspection Items (CE1354)

Last updated: June 09, 2025

Standpipe Plan Review Checklist (CE1353)

The plan review checklist was created to assist customers submitting plans for standpipe systems for HFD plan review and permit approval.

Last Updated: June 2024

After Hours Review Service Guide and Form (CE1251)

Guidelines and forms for requesting an after-hours review service (AHRS) for Building Code Enforcement Plan Review. 

Last updated: January 2026

Energy Compliance Information Certificate

The Energy Compliance Information Certificate sticker has been updated to conform to the newly adopted 2015 IECC. The sticker can be used to comply with Section 401.3 of the Houston Energy Code or, if preferred, a builder can use their own compliance sticker. After it is completed and printed, the certificate must be attached inside the electrical panel. This sticker can be printed on Avery® Labels 6876.

Last updated: February 20, 2025

Storm Checklist for Residential Projects

Storm plan review checklist for residential projects with tract size of less than 15,000 square feet

Last updated: Feb. 17, 2022

Residential Permitting 101

A general overview of the residential building permit process. This presentation will outline the basic steps involved in submitting plans for review, obtaining permits, and scheduling inspections for one and two-family dwellings.

Last updated: 5/22/2023