Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Energy Compliance Information Certificate

The Energy Compliance Information Certificate sticker has been updated to conform to the newly adopted 2015 IECC. The sticker can be used to comply with Section 401.3 of the Houston Energy Code or, if preferred, a builder can use their own compliance sticker. After it is completed and printed, the certificate must be attached inside the electrical panel. This sticker can be printed on Avery® Labels 6876.

Last updated: February 20, 2025

Wastewater Capacity Reservation Revision Application (UA007)

Request changes to your WCR letter.

Last updated: 05.19.2022. This document is maintained by Utility Analysis.

COH-TB-STD_ANSI_A Mod.dwg

City of Houston Standard Detail Title Block - ANSI A (8.5 x 11 inches) uploaded 12-12-2023

WCR Shopping Center Application (UA008)

Wastewater capacity reservation application form for shopping centers.

Last updated: 10.25.2019. This document is maintained by Utility Analysis.

Impact Fee Exemption Form (UA006)

Exemption form for low and moderate-cost single-family housing.
Effective: February 1, 2026

COH-TB-STD_ANSI_D Mod.pdf

City of Houston Standard Detail Title Block - ANSI D (34 x 22 inches) uploaded 12-12-2023

Small Meter Permit Requirements

Procedures for obtaining a small water meter.

Last updated: June 7, 2022

Energy Testing Results (CE1302)

When the Residential Energy Code requires energy testing (air leakage and duct leakage tests), the results must be documented using this form. The testing must be done by an independent third party energy technician registered with the City of Houston. The results will need to be submitted to the Mechanical Inspector at the final inspection. If more than 3 systems are installed, please fill out an additional form.

Last updated: 01-30-2024

Application Authorization Form (UA002)

Authorizes an agent on behalf of owner.

Last updated: 08.26.2019. This document is maintained by Utility Analysis.

Last Update: 2.11.2020. Updated to require representative's signature.

WCR Application Fee Schedule (UA0011)

Fee schedule for vacant land