Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Complete and attach this form to each plan set. Commercial plans must be submitted with this form in order for your plans to be considered as complete for the purpose of plan review.
Updated: October 4, 2024
Senate Bill 509 requires municipalities to verify that an asbestos survey has been conducted prior to issuing renovation or demolition permits for public or commercial buildings, and affects renovation and demolition permits for public or commercial buildings issued by municipalities on or after January 1, 2002.
Last updated: 06/09/2022
This guide outlines the permit and the plan review process associated with erecting scaffolding and other structures to serve as pedestrian protection during construction, repairs, and demolition projects.
Last updated: 01-01-2023
To define the minimum plan review requirements to obtain a building permit for the installation of a Modular or Prefabricated Building. Code requirements that apply to newly constructed buildings also apply to these prefabricated structures except state approved plans which are accepted without additional review.
Last updated: February 2024
Last Updated: June 20, 2025.
The Energy Compliance Information Certificate sticker has been updated to conform to the newly adopted 2015 IECC. The sticker can be used to comply with Section 401.3 of the Houston Energy Code or, if preferred, a builder can use their own compliance sticker. After it is completed and printed, the certificate must be attached inside the electrical panel. This sticker can be printed on Avery® Labels 6876.
Last updated: February 20, 2025
Sign Administration Frequently Asked Questions
Updated: November 2025.
The following drawing is an example of typical construction and can be used as a reference.
NOTE: This is not an engineered drawing.
This is a guide to assist in the plan review, permit, and inspection process for the installation of a solar panel system. The required components to be included in drawings to obtain permits, and the items that the city inspectors will be verifying in the field during the inspection process are included.
Last updated: 03/25/2024
General prerequisite requirements for plan review. This form must be completed by the sign contractor.
Last updated: December 5, 2025