Use a mixture of filters or keywords to find documents and resources by department, type or topic.
By state law, sprinkler plans must be designed by a licensed sprinkler contractor. Typically, the sprinkler contractor is selected by the general contractor after the construction documents have been submitted for a permit or the building permit has been issued. As a result, sprinkler drawings are designed and submitted after the building plans are reviewed and construction has commenced.
Last updated: January 2026
Tip sheet for obtaining a floodplain permit for a residential remodel project in the floodplain.
For installation, relocation or alteration of Elevators, Dumbwaiters, Moving Walks, Chairlifts, Escalators, Manlifts, Wheelchairlifts, Personnel Hoists.
Last updated: March 2025
Last updated: January 2026
Guide for obtaining a floodplain permit for a residential addition.
General information about the Floodplain Management Office and its services.
Last updated: April 17, 2024
List of frequently asked questions about conveyance zones.
Frequently asked questions about mitigation in the floodplain.