Use a mixture of filters or keywords to find documents and resources by department, type or topic.

February 2, 2026
Sponsor Change Form

Sponsor change form for small water meters between 5/8-inch and 2-inches in size.
Last update: 03/01/2024.

Owner Self-certification Worksheet

Project cost estimate worksheets for if an owner is doing work with or without a contractor.

Ordinance No. 2018-258

Signed and adopted changes to the City's floodplain ordinance, Chapter 19.

January 26, 2026
January 19, 2026
January 12, 2026
Residential Interior Remodel Tip Sheet

Tip sheet for obtaining a floodplain permit for a residential remodel project in the floodplain.

Transient Meter Application Procedures

Application procedures for renting a transient meter.

Last updated: 12/15/2022

Flood Damage Repair Checklist for Commercial and Multifamily Residential Properties

Checklist for obtaining a floodplain development permit for flood damage repair to a commercial or multifamily residential property.