Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Approved Fabricator Guidelines (CE1285)

The guide explains the requirements and procedures of the City of Houston-approved fabricator program. 

Last updated: February 20, 2026

Post Install Solar Inspection Letter (CE-1387b)

This is an example inspection letter for a Solar APP+ project. For an example of a typical solar panel system, refer to form CE-1387a.

Last updated: Nov. 17, 2022 

Post Install Solar Inspection Letter (CE-1387a)

This is an example of an inspection letter for a typical solar panel system. For a Solar APP+ project, refer to form CE-1387b.

Last updated: Nov. 17, 2022

02082-06 Sanitary Sewer Manhole Vent for Sealed Manhole

2021 Detail for 02082-06 Sanitary Sewer Manhole Vent for Sealed Manhole (effective October 1, 2021)

 

Last updated: July 6, 2021

02083N-01 4'-0 Diameter Fiberglass Manhole Notes
02082-03 5'-0" - 8'-0" Diameter Precast Concrete Manhole
02082N-02 4'-0 Diameter Precast Concrete Manhole Notes
Registration Process for State Air Conditioning Licenses (CE1308)

Registration & Renewal Process for State Air Conditioning Licenses.

Last updated: 03/08/2024

Flood Damage Repair Checklist for Single-family Residential Properties

Checklist for obtaining a floodplain development permit for flood damage repair on single-family residential property.

Flood Damage Repair Checklist for Commercial and Multifamily Residential Properties

Checklist for obtaining a floodplain development permit for flood damage repair to a commercial or multifamily residential property.