Use a mixture of filters or keywords to find documents and resources by department, type or topic.

22-04-R, 1-Hour Fire-Rated Exterior Wall for Block & Base Foundations (Sub-floor Knee Wall)

1 Hour Fire-Rated Exterior Wall for Block & Base Foundations (Sub-floor Knee Wall) 

Revised 01/17/2023

Solar Ready Example DWG 22-01-R

This example drawing identifies what is needed on the roof plan to be compliant with the solar-ready provisions. This is drawing for reference only.

Last updated Jan. 17, 2023

12-08-R Example site plan for drainage requirements

Example site plan for drainage requirements.

Owner Self-certification Worksheet

Project cost estimate worksheets for if an owner is doing work with or without a contractor.

Application for Reconnect Permit for Manufactured Home (CE-1188)

Application for a reconnect permit for a manufactured home or recreational vehicle.

Last updated: January 2026

Third Grade Stationary Engineer Application (CE1313)

CE-1313: Third Grade Stationary Engineer Application.

Last updated: 06/028/2024

25-06-R Basic Wall Frame For Window (Dangerous Building)

Last Updated: April 2025.

25-09-R Window Barrier Mounted Inside of Structure (Dangerous Building)

Last Updated: April 2025.

House Moving Permit Application (CE1185)

Application for a house moving permit.

Last updated: January 2026

Audit of Fabrication Practices Wood Truss- (CE1286)

Form must be completed by the Special Inspection Agency.

Last updated: June 2025.