Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Solar Ready Example DWG 22-01-R

This example drawing identifies what is needed on the roof plan to be compliant with the solar-ready provisions. This is drawing for reference only.

Last updated Jan. 17, 2023

12-08-R Example site plan for drainage requirements

Example site plan for drainage requirements.

Dangerous Building Repair (CE_1336)

This guide provides the requirements for repairing dangerous buildings.

Last updated: 04-03-2025

Occupancy Inspections for Existing Buildings (CE1278)

This guide provides the qualifications and submittal requirements for requesting a Certificate of Occupancy for existing buildings.

Last updated: November 5, 2025.

25-06-R Basic Wall Frame For Window (Dangerous Building)

Last Updated: April 2025.

25-09-R Window Barrier Mounted Inside of Structure (Dangerous Building)

Last Updated: April 2025.

Overview of the General Commercial Permit Process (CE1279)

This brochure is intended to provide a very high level overview of the commercial building permit process.

Last updated: 1/1/2019

25-11-R Window or Door Construction (Dangerous Building)

Last Updated: April 2025.

12-03-R Generator location requirements for single family residence

Generator location requirements for single family residence.

25-08-R Door Barrier Mounted Inside of Structure (Dangerous Building)

Last Updated: April 2025.