Use a mixture of filters or keywords to find documents and resources by department, type or topic.

12-03-R Generator location requirements for single family residence

Generator location requirements for single family residence.

18-02-R Two family dwelling vertical separation

Two family dwelling vertical separation

Live-Work Program (CE1277)

This guide provides an overview of the qualifications and submittal requirements for projects that wish to establish a Live-Work unit through the Occupancy Inspection Section.

Last updated: 2/13/2019

Occupancy Inspections for Existing Buildings (CE1278)

This guide provides the qualifications and submittal requirements for requesting a Certificate of Occupancy for existing buildings.

Last updated: 2/12/2019

Overview of the General Commercial Permit Process (CE1279)

This brochure is intended to provide a very high level overview of the commercial building permit process.

Last updated: 1/1/2019

12-08-R Example site plan for drainage requirements

Example site plan for drainage requirements.

Acknowledgement of Fire Extinguishing System (CE1306)

This acknowledgement must be completed by the licensee and submitted to the Fire Marshal’s Office prior to scheduling a final inspection.

Last updated: 01/01/2023

Solar Ready Example DWG 22-01-R

This example drawing identifies what is needed on the roof plan to be compliant with the solar-ready provisions. This is drawing for reference only.

Last updated Jan. 17, 2023

16-06-R Appendix L Illustration

Appendix L Illustration

19-05-R Two family dwelling horizontal separation

Last Updated 10/10/2019