Use a mixture of filters or keywords to find documents and resources by department, type or topic.

6 Pump VFD Pump System

6 VFD Pump System

01555-13 Traffic Control Plan for Signal Construction

01555-13 Traffic Control Plan for Signal Construction

Updated 11-26-2023

13501-01 Speed Cushions Arrangement and Installation

13501-01 Speed Cushions Arrangement and Installation

Updated 11-26-2023

13501-01 Speed Cushions Arrangement and Installation

13501-01 Speed Cushions Arrangement and Installation 

31-01 Space Requirements for Off Street Parking

31-01 Space Requirements for Off Street Parking

01512-01 to 01512-12 Traffic Control
  • TCP Notes Channelizing Device and Barricades
  • TCP Overall Traffic Control Layout
  • Traffic Control Layout
  • TCP One Lane Closure Phase 1 & 2
  • TCP One Lane Closure
  • TCP Typical 3-Way Intersection Phase 1 of 3
  • TCP Typical 3-Way Intersection Phase 2 of 3
  • TCP Typical 3-Way Intersection Phase 3 of 3
  • TCP 4-Way Intersection Phase 1 of 4
  • TCP 4-Way Intersection Phase 2 of 4
  • TCP 4-Way Intersection Phase 3 of 4
  • TCP 4-Way Intersection Phase 4 of 4
  •  
Standard details for elevated residential foundations

Standard details for joint City/County low cost and innovative residential foundation systems for elevated homes. The submitted plans must identify which one of the systems in the standard designs will be utilized for their project.

 

Last updated: August 2020

01562-06_2023_11_MOD.dwg

01562-06 Uploaded 12-14-2023

02893-05 Truck Fiber Aerial to Underground Transitions

02893-05 Truck Fiber Aerial to Underground Transitions

Updated 11-26-2023

01562-05_2023_11_MOD.dwg

01562-05 Uploaded 12-14-2023