Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Barricade and Channelizing Devices
Updated on 11/24/2023
02754-03 Proposed Sidewalk Through Driveway with Excessive Elevation Difference
02754-04 Existing/Proposed Curb Level Sidewalk Conditions
By state law, sprinkler plans must be designed by a licensed sprinkler contractor. Typically, the sprinkler contractor is selected by the general contractor after the construction documents have been submitted for a permit or the building permit has been issued. As a result, sprinkler drawings are designed and submitted after the building plans are reviewed and construction has commenced.
Last updated: January 2026
For installation, relocation or alteration of Elevators, Dumbwaiters, Moving Walks, Chairlifts, Escalators, Manlifts, Wheelchairlifts, Personnel Hoists.
Last updated: March 2025
Construction Sign Build Houston Forward
Updated 11/24/2023
Revised on 01/17/2023