Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Approved Fabricator Guidelines (CE1285)

The guide explains the requirements and procedures of the City of Houston-approved fabricator program. 

Last updated: February 20, 2026

Post Install Solar Inspection Letter (CE-1387b)

This is an example inspection letter for a Solar APP+ project. For an example of a typical solar panel system, refer to form CE-1387a.

Last updated: Nov. 17, 2022 

Post Install Solar Inspection Letter (CE-1387a)

This is an example of an inspection letter for a typical solar panel system. For a Solar APP+ project, refer to form CE-1387b.

Last updated: Nov. 17, 2022

Standard Details for Construction Services

Standard Details for Construction Services.

2023 List of Standard Details for Construction Signs.pdf

List of Standard Details for Construction Signs

Updated on 5/23/2024

02082-07 Corrosion Resistant Manhole for Force Main Discharge

02082-07 Corrosion Resistant Manhole for Force Main Discharge

02754-01B to 02754-02

02754-01B Driveway Detail with 6” Curbed Streets

02754-02 Driveways with Culverts or Valley Gutters on Open Ditch Type Streets

01562-02_2023_11_MOD.dwg

01562-02 MOD DWG uploaded 12-14-2023

Registration Process for State Air Conditioning Licenses (CE1308)

Registration & Renewal Process for State Air Conditioning Licenses.

Last updated: 03/08/2024

02083N01 4'-0 Diameter Fiberglass Manhole Notes

02083N01 4'-0 Diameter Fiberglass Manhole Notes