Use a mixture of filters or keywords to find documents and resources by department, type or topic.

01562-02 Tree and Root Pruning

01562-02 Tree and Root Pruning

01555-15_ End of Street Sign_2023_11

End of Street Sign

Update 11/24/2023

6 Pump VFD Pump System

6 VFD Pump System

02082-07 Corrosion Resistant Manhole for Force Main Discharge

02082-07 Corrosion Resistant Manhole for Force Main Discharge

13501-01 Speed Cushions Arrangement and Installation

13501-01 Speed Cushions Arrangement and Installation 

01580-01 Barricade Standard
01562-02_2023_11_MOD.dwg

01562-02 MOD DWG uploaded 12-14-2023

31-01 Space Requirements for Off Street Parking

31-01 Space Requirements for Off Street Parking

01512-01 to 01512-12 Traffic Control
  • TCP Notes Channelizing Device and Barricades
  • TCP Overall Traffic Control Layout
  • Traffic Control Layout
  • TCP One Lane Closure Phase 1 & 2
  • TCP One Lane Closure
  • TCP Typical 3-Way Intersection Phase 1 of 3
  • TCP Typical 3-Way Intersection Phase 2 of 3
  • TCP Typical 3-Way Intersection Phase 3 of 3
  • TCP 4-Way Intersection Phase 1 of 4
  • TCP 4-Way Intersection Phase 2 of 4
  • TCP 4-Way Intersection Phase 3 of 4
  • TCP 4-Way Intersection Phase 4 of 4
  •  
Standard details for elevated residential foundations

Standard details for joint City/County low cost and innovative residential foundation systems for elevated homes. The submitted plans must identify which one of the systems in the standard designs will be utilized for their project.

 

Last updated: August 2020