Use a mixture of filters or keywords to find documents and resources by department, type or topic.

31-02 Space Requirements for Off Street Parking

31-02 Space Requirements for Off Street Parking

01509-01 to 01509-07 Construction Signs

01509-01 to 01509-07 Construction Signs

08R05 Post Foundation for Carports/Patios
01512-01 to 01512-12 Traffic Control
  • TCP Notes Channelizing Device and Barricades
  • TCP Overall Traffic Control Layout
  • Traffic Control Layout
  • TCP One Lane Closure Phase 1 & 2
  • TCP One Lane Closure
  • TCP Typical 3-Way Intersection Phase 1 of 3
  • TCP Typical 3-Way Intersection Phase 2 of 3
  • TCP Typical 3-Way Intersection Phase 3 of 3
  • TCP 4-Way Intersection Phase 1 of 4
  • TCP 4-Way Intersection Phase 2 of 4
  • TCP 4-Way Intersection Phase 3 of 4
  • TCP 4-Way Intersection Phase 4 of 4
  •  
02912-01 Tree Root Barriers (Circular)

02912-01 Tree Root Barriers (Circular)

02083N01 4'-0 Diameter Fiberglass Manhole Notes

02083N01 4'-0 Diameter Fiberglass Manhole Notes

01580-04 Construction Sign ReBuild Houston Project Drainage Utility Fee Funding
02775-08 to 02902-02

02775-08 Sidewalks and Clear Zone For Transit Corridor Street

02902-01 Pavement Repair Details for Street Cuts

02902-02 Pavement Repair Details for Street Cuts - Non Reinforced Concrete and Brick Pavement

01562-01_2023_11_MOD.dwg

Tree Protection General Requirement uploaded 12-14-2023

Tree Protection General Requirements

Tree Protection General Requirements PDF