Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Signs EPR User Gudie

Electronic plan review user guide for sign projects

Water Main Extension Procedure

Procedures for obtaining water main extension permit.

Last updated: 1/1/2019

Developer Performance Bond - Non DPC

Developer performance bond as required by City of Houston Code Sec. 47-163. This is for non-Developer Participation Contract (DPC) projects.
Last update: 07/24/2020.
This document is maintained by Taps & Meters.

Large Job Application - Meters

Application for large meters.

Last updated: 6/13/2022

Live-Work Program (CE1277)

This guide provides an overview of the qualifications and submittal requirements for projects that wish to establish a Live-Work unit through the Occupancy Inspection Section.

Last updated: 2/13/2019

Sewer Main Extension Procedure

Procedures for obtaining a permit for lateral sanitary sewer main extension.

Last updated: 8/1/2018

Commercial Service Application

Application for establishing a commercial water and wastewater billing account with Customer Account Services. 

Last update: 01/04/2021

How to View and Respond to OCE Comments

This guide shows users how to view and respond to plan review comments in ProjectDox for projects submitted to the Office of the City Engineer.

Last updated: 08/17/2022 

Occupancy Inspections for Existing Buildings (CE1278)

This guide provides the qualifications and submittal requirements for requesting a Certificate of Occupancy for existing buildings.

Last updated: 2/12/2019

Commercial EPR Guide (Spanish)