Use a mixture of filters or keywords to find documents and resources by department, type or topic.
A fillable version of Form 584 for General Utility Easement.
Updated: June 2025.
By state law, sprinkler plans must be designed by a licensed sprinkler contractor. Typically, the sprinkler contractor is selected by the general contractor after the construction documents have been submitted for a permit or the building permit has been issued. As a result, sprinkler drawings are designed and submitted after the building plans are reviewed and construction has commenced.
Last updated: January 2026
Easement Reverter Flowchart.
This document maintained by the Joint Referral Committee.
Request For Acknowledgment Of Easement Reverter.
This document maintained by the Joint Referral Committee.
Cover sheet for easement dedication submittals to the Office of the City Engineer.
Last updated: January 2026
For installation, relocation or alteration of Elevators, Dumbwaiters, Moving Walks, Chairlifts, Escalators, Manlifts, Wheelchairlifts, Personnel Hoists.
Last updated: March 2025
This form is used for easement dedication of general utilities.
Updated: June 2025.
Last updated: January 2026
Easement Reverter Guidelines.
This document maintained by the Joint Referral Committee.
For installation, relocation or alteration of Elevators, Dumbwaiters, Moving Walks, Chairlifts, Escalators, Manlifts, Wheelchairlifts, Personnel Hoists.
Last updated: March 2025