Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Consent to Encroachment over City Easement

Form PW-9873C for consent to encroachment over a City easement.

Last updated: June 2020

Modular Building Submittal Requirements (CE1099)

To define the minimum plan review requirements to obtain a building permit for the installation of a Modular or Prefabricated Building. Code requirements that apply to newly constructed buildings also apply to these prefabricated structures except state approved plans which are accepted without additional review. 

Last updated: February 2024

Solar APP+ Application Guidelines_CE-1410

Last Updated: June 20, 2025.

Form 584 - Water Meter Easement Dedication

Easement dedication form for water meters (Form 584)

Wastewater Capacity Reservation Revision Application (UA007)

Request changes to your WCR letter.

Last updated: 05.19.2022. This document is maintained by Utility Analysis.

14-03-R Single Family Residential Driveways Interlocking Concrete Permeable Paver and Flexible Plastic Grid Paver Systems

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.  

Commercial Prerequisite Checklist (CE1105)

Complete and attach this form to each plan set. Commercial plans must be submitted with this form in order for your plans to be considered as complete for the purpose of plan review.

Updated: October 4, 2024

Solar Photovoltaic Panel Permit & Inspection Guide and Checklist(CE1198)

This is a guide to assist in the plan review, permit, and inspection process for the installation of a solar panel system. The required components to be included in drawings to obtain permits, and the items that the city inspectors will be verifying in the field during the inspection process are included.

Last updated: 03/25/2024

Plan Review Prerequisites Checklist (CE-1427)

General prerequisite requirements for plan review. This form must be completed by the sign contractor.

Last updated: December 5, 2025

Standpipe Plan Review Checklist (CE1353)

The plan review checklist was created to assist customers submitting plans for standpipe systems for HFD plan review and permit approval.

Last Updated: June 2024