Use a mixture of filters or keywords to find documents and resources by department, type or topic.
The guide explains the requirements and procedures of the City of Houston-approved fabricator program.
Last updated: February 20, 2026
Cover sheet for easement dedication submittals to the Office of the City Engineer.
Last updated: January 2026
The following detail and specifications, issued in conjunction with the Department of Neighborhoods and Health Department, identifies requirements for the demolition of swimming pools and spas; including, but not limited to, pools determined to be in violation of the City of Houston Minimum Standards or Dangerous Building Ordinance.
Last updated: January 2026
2021 Detail for 02517-01 LDWL Tunnel and Casing Details for Water Lines 24-Inch and Larger (effective October 1, 2021)
Last updated: July 6, 2021
This is an example inspection letter for a Solar APP+ project. For an example of a typical solar panel system, refer to form CE-1387a.
Last updated: Nov. 17, 2022
This is an example of an inspection letter for a typical solar panel system. For a Solar APP+ project, refer to form CE-1387b.
Last updated: Nov. 17, 2022