Use a mixture of filters or keywords to find documents and resources by department, type or topic.
02522-01 Standard LDWL Butterfly Valve and Operator Manhole Details
02511-03 Standard LDWL Drain Line Valve Details
Human Trafficking Hotel Employee Training (HT-002)
This policy establishes and builds upon the requirement in Sec. 28-212 regarding hotel employee training and certification requirements.
Last updated: October 12, 2023
02517-01 LDWL Tunnel and Casing Details for Water Lines 24-Inch and Larger
2021 Detail for 02517-01 LDWL Tunnel and Casing Details for Water Lines 24-Inch and Larger (effective October 1, 2021)
Last updated: July 6, 2021
Checklist 30pct 50pct And 70pct For Developer Participation Contract
Developer Participation Contract (DPC) checklist for developers.
Last updated: 3/21/2022
02317-09 (2020 Detail)
2020 Detail for 02317-09 Standard LDWL Excavation and Backfill Detail
02447-01 Bedding Backfill Auger Pit Auger Hole
02523-01 Reduced Pressure Backflow Preventer RPBP
15641-02 (2020 Detail)
2020 Detail for 15641-02 Standard LDWL Cathodic Protection Details for Test Stations (Sheet 2 of 3)