Use a mixture of filters or keywords to find documents and resources by department, type or topic.

02511-03 Standard LDWL Drain Line Valve Details
02520-01 (2020 Detail)

2020 Detail for 02520-01 Standard Fire Hydrant Detail 

Human Trafficking Hotel Employee Training (HT-002)

This policy establishes and builds upon the requirement in Sec. 28-212 regarding hotel employee training and certification requirements.

 

Last updated: October 12, 2023

02517-01 LDWL Tunnel and Casing Details for Water Lines 24-Inch and Larger

2021 Detail for 02517-01 LDWL Tunnel and Casing Details for Water Lines 24-Inch and Larger (effective October 1, 2021)

 

Last updated: July 6, 2021

Checklist 30pct 50pct And 70pct For Developer Participation Contract

Developer Participation Contract (DPC) checklist for developers.

Last updated: 3/21/2022

02317-09 (2020 Detail)

2020 Detail for 02317-09 Standard LDWL Excavation and Backfill Detail 

02447-01 Bedding Backfill Auger Pit Auger Hole
02523-01 Reduced Pressure Backflow Preventer RPBP
15641-02 (2020 Detail)

2020 Detail for 15641-02 Standard LDWL Cathodic Protection Details for Test Stations (Sheet 2 of 3)