Use a mixture of filters or keywords to find documents and resources by department, type or topic.
The fabricators on this list have been certified by a third-party agency and approved by the City of Houston to produce or fabricate primary structural components for buildings.
Last updated: February 19, 2026
The guide explains the requirements and procedures of the City of Houston-approved fabricator program.
Last updated: February 20, 2026
This is an example inspection letter for a Solar APP+ project. For an example of a typical solar panel system, refer to form CE-1387a.
Last updated: Nov. 17, 2022
This is an example of an inspection letter for a typical solar panel system. For a Solar APP+ project, refer to form CE-1387b.
Last updated: Nov. 17, 2022
Application form for a storm water quality (SWQ) permit.
Last updated: July 2024
List of Registered Independent Energy Technicians.
Last Updated: February 20, 2026
Registration & Renewal Process for State Air Conditioning Licenses.
Last updated: 03/08/2024
This is a guide to assist in the plan review, permit, and inspection process for the installation of a solar panel system. The required components to be included in drawings to obtain permits, and the items that the city inspectors will be verifying in the field during the inspection process are included.
Last updated: 03/25/2024