Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Checklist 30pct 50pct And 70pct For Developer Participation Contract

Developer Participation Contract (DPC) checklist for developers.

Last updated: 3/21/2022

WCR Shopping Center Application (UA008)

Wastewater capacity reservation application form for shopping centers.

Last updated: 10.25.2019. This document is maintained by Utility Analysis.

Impact Fee Exemption Form (UA006)

Exemption form for low and moderate-cost single-family housing.
Effective: February 1, 2026

List of Registered Independent Third Party Energy Technicians (CE-1406)

List of Registered Independent Energy Technicians.

Last Updated: February 18, 2026

Small Meter Permit Requirements

Procedures for obtaining a small water meter.

Last updated: June 7, 2022

Wastewater Capacity Reservation Revision Application (UA007)

Request changes to your WCR letter.

Last updated: 05.19.2022. This document is maintained by Utility Analysis.

List of Registered Fabricators

The fabricators on this list have been certified by a third-party agency and approved by the City of Houston to produce or fabricate primary structural components for buildings.

Last updated: February 19, 2026

List of Registered Special Inspectors

List of approved special inspectors. 

Last updated: February 19, 2026

Application Authorization Form (UA002)

Authorizes an agent on behalf of owner.

Last updated: 08.26.2019. This document is maintained by Utility Analysis.

Last Update: 2.11.2020. Updated to require representative's signature.

WCR Application Fee Schedule (UA0011)

Fee schedule for vacant land

Last updated: 01/01/2025