Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Sprinkler Go-to-Work Permit Guideline (CE1260)

By state law, sprinkler plans must be designed by a licensed sprinkler contractor. Typically, the sprinkler contractor is selected by the general contractor after the construction documents have been submitted for a permit or the building permit has been issued. As a result, sprinkler drawings are designed and submitted after the building plans are reviewed and construction has commenced.

Last updated: January 2026

02082-06 Sanitary Sewer Manhole Vent for Sealed Manhole

2021 Detail for 02082-06 Sanitary Sewer Manhole Vent for Sealed Manhole (effective October 1, 2021)

 

Last updated: July 6, 2021

List of the Currently Adopted Construction Codes (CE1199)

List of the currently adopted codes.

Last updated: 03-07-2024

iPermits How to Purchase a Trade Permit

How to guide for purchasing a trade permit online through iPermits portal.

2021 Uniform Plumbing Code | UPC

The 2021 Uniform Plumbing Code was adopted on October 25, 2023, and became effective on January 2, 2023.

Last updated: December 26, 2023

Electrical Wiring Permit Application (CE1057)

This is a building permit application for Electrical Systems and Wiring within the city limits of Houston, Texas.

Last updated: January 2026

02083N-01 4'-0 Diameter Fiberglass Manhole Notes
2020 NEC Administrative Code Provisions

The Administrative Code Provisions to the 2020 National Electrical Code (NEC) were adopted on December 1, 2021, and become effective on April 1, 2022.

Last updated: Mar. 20, 2023

02082-03 5'-0" - 8'-0" Diameter Precast Concrete Manhole
02082N-02 4'-0 Diameter Precast Concrete Manhole Notes