Use a mixture of filters or keywords to find documents and resources by department, type or topic.
02771-01 Curb, Curb and Gutter, and Header Details
Updated 12-19-2023
02775-02 Typical Curb Ramp Details
Updated 12-19-2023
02775-01 Typical Sidewalk Layout and Details for Streets with Curbs
Updated 12-19-2023
Proposed Sidewalk Through Driveway with Minimal Elevation Difference
Updated 11-26-2023
The guide explains the requirements and procedures of the City of Houston-approved fabricator program.
Last updated: February 20, 2026
This is an example inspection letter for a Solar APP+ project. For an example of a typical solar panel system, refer to form CE-1387a.
Last updated: Nov. 17, 2022
This is an example of an inspection letter for a typical solar panel system. For a Solar APP+ project, refer to form CE-1387b.
Last updated: Nov. 17, 2022
Concrete Pavement Details
Updated 11-26-2023
List of the currently adopted codes.
Last updated: 03-07-2024
The Administrative Code Provisions to the 2020 National Electrical Code (NEC) were adopted on December 1, 2021, and become effective on April 1, 2022.
Last updated: Mar. 20, 2023