Use a mixture of filters or keywords to find documents and resources by department, type or topic.

02775-05 Commercial & High Density Conditions Curb Ramp Details

Commercial & High-Density Conditions Curb Ramp Details

Updated 11-26-2023

02775-05_2023_11_MOD.dwg

02775-05 Commercial & High Density Conditions Curb Ramp Details

Updated 12-19-2023

02771-01_2023_11_MOD.dwg

02771-01 Curb, Curb and Gutter, and Header Details

Updated 12-19-2023

02775-02_2023_11_MOD.dwg

02775-02 Typical Curb Ramp Details

Updated 12-19-2023

02775-01_2023_11_MOD.dwg

02775-01 Typical Sidewalk Layout and Details for Streets with Curbs

Updated 12-19-2023

02754-04 Proposed Sidewalk Through Driveway with Minimal Elevation Difference

Proposed Sidewalk Through Driveway with Minimal Elevation Difference 

Updated 11-26-2023

List of Registered Fabricators

The fabricators on this list have been certified by a third-party agency and approved by the City of Houston to produce or fabricate primary structural components for buildings.

Last updated: February 19, 2026

02751-01 Concrete Pavement Details

Concrete Pavement Details 

Updated 11-26-2023

List of the Currently Adopted Construction Codes (CE1199)

List of the currently adopted codes.

Last updated: 03-07-2024

2020 NEC Administrative Code Provisions

The Administrative Code Provisions to the 2020 National Electrical Code (NEC) were adopted on December 1, 2021, and become effective on April 1, 2022.

Last updated: Mar. 20, 2023