Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Post Install Solar Inspection Letter (CE-1387b)

This is an example inspection letter for a Solar APP+ project. For an example of a typical solar panel system, refer to form CE-1387a.

Last updated: Nov. 17, 2022 

Post Install Solar Inspection Letter (CE-1387a)

This is an example of an inspection letter for a typical solar panel system. For a Solar APP+ project, refer to form CE-1387b.

Last updated: Nov. 17, 2022

Registration Process for State Air Conditioning Licenses (CE1308)

Registration & Renewal Process for State Air Conditioning Licenses.

Last updated: 03/08/2024

Solar Photovoltaic Panel Permit & Inspection Guide and Checklist(CE1198)

This is a guide to assist in the plan review, permit, and inspection process for the installation of a solar panel system. The required components to be included in drawings to obtain permits, and the items that the city inspectors will be verifying in the field during the inspection process are included.

Last updated: 03/25/2024

02951-02 Street Cut for Concrete Pavement Replacement | Restoration Age of Pavement > 5yrs

02951-02 Street Cut for Concrete Pavement Replacement | Restoration Age of Pavement > 5yrs

Updated 11-26-2023

02951-04 Pavement Repair Detail for Street Cuts (Flex-Base Pavement & Concrete Pavement)

02951-04 Pavement Repair Detail for Street Cuts (Flex-Base Pavement & Concrete Pavement)

Updated 11-26-2023

Pavement Repair Detail for Street Cuts (Non-Reinforced Concrete & Brick Pavement)

Pavement Repair Detail for Street Cuts  (Non-Reinforced Concrete & Brick Pavement)

Updated 11-26-2023

List of Standard Details – Street cut Details

List of Standard Details – Street cut Details

Updated 11-26-2023

TxDOT Sanitary Sewer Details
Stationary Engineer License Requirements (CE1221)

Stationary Engineer License Requirements.

Last updated: February 2026