Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Street Cut for Concrete Pavement Replacement/Restoration Age of Pavement <= 5yrs
Updated 12-18-2023
Presentation slides from the 2015 IECC COMcheck public workshop on September 16, 2020.
The form is used to calculate an actual occupant load in educational spaces governed by the Texas Educational Agency (TEA) rules that limit maximum class size to approximately 2/3rds of that specified by the IBC occupant load factor identified in Table 1004.1.2 for educational spaces.
Updated 01-01-2023
Pavement Repair Detail for Street Cuts (Non-Reinforced Concrete & Brick Pavement)
Updated 11-26-2023
02951-05 Pavement Repair Detail for Street Cuts (Non-Reinforced Concrete & Brick Pavement)
Updated 12-18-2023
02951-04 Pavement Repair Detail for Street Cuts (Flex-Base Pavement & Concrete Pavement)
Updated: 12-18-2023
02951-02 Street Cut for Concrete Pavement Replacement | Restoration Age of Pavement > 5yrs
Updated 12-18-2023
02951-03 Street Cut for Asphalt Pavement Replacement | Restoration for Pavement of All Ages
Updated 12-18-2023
02951-05 Pavement Repair Detail for Street Cuts (Non-Reinforced Concrete & Brick Pavement)
Updated 11-26-2023
02951-02 Street Cut for Concrete Pavement Replacement | Restoration Age of Pavement > 5yrs
Updated 11-26-2023