Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Sewer Main or Lateral Application

Permit application for the construction of a sanitary sewer main or lateral taps to manholes.

Wastewater Capacity Reservation Name Transfer Application (UA003)

Transfers capacity to a new property owner. (form UA003)

Last updated: 10.25.2019. This document is maintained by Utility Analysis

Large Meter Permit Requirements

Permitting requirements and procedures for obtaining large water meter permits.

Last updated: 10/14/2021

Fire Hydrant Installation and Relocation Procedure

Procedures for obtaining a permit to install or relocate a fire hydrant.

Last updated: 7/1/2017

Water Main Offset Procedure

Procedures for obtaining a water main offset permit. 

Last updated: 1/1/2019

Large Job Application - Meters

Application for large meters.

Last updated: 6/13/2022

Commercial Service Application

Application for establishing a commercial water and wastewater billing account with Customer Account Services. 

Last update: 01/04/2021

18-07 Interior Wood Partition
08C02 Commercial Wood Guardrail

08C02 Commercial Wood Guardrail Instructions

04 Technical Memo, EV-Ready Appendices.pdf

This technical memo is provided to describe the new changes to the Houston Amendments to the 2021 International Energy Conservation Code (IECC) for Commercial and Residential provisions with regards to the requirement for EV readiness.  These changes provide options for builders and owners to provide EV-ready construction. 

 

Uploaded 02/13/2024