Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Stationary Engineer License Requirements.
Last updated: February 2026
The guide explains the requirements and procedures of the City of Houston-approved fabricator program.
Last updated: February 20, 2026
Transfers capacity to a new property owner. (form UA003)
Last updated: 10.25.2019. This document is maintained by Utility Analysis.
Request changes to your WCR letter.
Last updated: 05.19.2022. This document is maintained by Utility Analysis.
Authorizes an agent on behalf of owner.
Last updated: 08.26.2019. This document is maintained by Utility Analysis.
Last Update: 2.11.2020. Updated to require representative's signature.
Step by step guide for applying for a wastewater capacity letter online.
Last updated: January 18, 2022
For shopping center with excess capacity.
Last updated: 10.25.2019. This document is maintained by Utility Analysis.
List of the currently adopted codes.
Last updated: 03-07-2024
The following detail and specifications, issued in conjunction with the Department of Neighborhoods and Health Department, identifies requirements for the demolition of swimming pools and spas; including, but not limited to, pools determined to be in violation of the City of Houston Minimum Standards or Dangerous Building Ordinance.
Last updated: January 2026