Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Stationary Engineer License Requirements (CE1221)

Stationary Engineer License Requirements.

Last updated: February 2026

Approved Fabricator Guidelines (CE1285)

The guide explains the requirements and procedures of the City of Houston-approved fabricator program. 

Last updated: February 20, 2026

Wastewater Capacity Reservation Name Transfer Application (UA003)

Transfers capacity to a new property owner. (form UA003)

Last updated: 10.25.2019. This document is maintained by Utility Analysis

Wastewater Capacity Reservation Revision Application (UA007)

Request changes to your WCR letter.

Last updated: 05.19.2022. This document is maintained by Utility Analysis.

TxDOT Sanitary Sewer Details
Application Authorization Form (UA002)

Authorizes an agent on behalf of owner.

Last updated: 08.26.2019. This document is maintained by Utility Analysis.

Last Update: 2.11.2020. Updated to require representative's signature.

User Guide for online WCR Application Process

Step by step guide for applying for a wastewater capacity letter online.

 

Last updated: January 18, 2022

Shopping Center Approval Denial Letter Application (UA009)

For shopping center with excess capacity.

Last updated: 10.25.2019. This document is maintained by Utility Analysis.

List of the Currently Adopted Construction Codes (CE1199)

List of the currently adopted codes.

Last updated: 03-07-2024

Swimming Pool Demolition Guidelines (CE1090)

The following detail and specifications, issued in conjunction with the Department of Neighborhoods and Health Department, identifies requirements for the demolition of swimming pools and spas; including, but not limited to, pools determined to be in violation of the City of Houston Minimum Standards or Dangerous Building Ordinance.

Last updated: January 2026